Convention Centre Dublin

Convention Centre Dublin
Ionad Comhdhála, Baile Átha Cliath
Convention Centre Dublin logo.png
Dublin The Convention Centre 01.JPG
General information
Architectural style Modern
Address Spencer Dock,
North Wall Quay,
Dublin 1
Town or city Dublin
Country Ireland
Coordinates 53°20′53.412″N 6°14′21.561″W / 53.34817000°N 6.23932250°W / 53.34817000; -6.23932250Coordinates: 53°20′53.412″N 6°14′21.561″W / 53.34817000°N 6.23932250°W / 53.34817000; -6.23932250
Construction started 1998
Completed 5th May 2010
Opened September 7, 2010; 6 years ago (2010-09-07)
Cost £104 million in 1999
Technical details
Floor area 39,567 m²
Design and construction
Developer Harry Crosbie
Other designers Kevin Roche
Awards and prizes Best Overseas Conference Centre
Known for The first carbon neutral constructed convention centre in the world
Other information
Seating capacity 8,000
Number of rooms 22
Parking 320 regular spaces and 8 disabled in underground carpark
Website
www.theccd.ie

The Convention Centre Dublin (Irish: Ionad Comhdhála, Baile Átha Cliath) in the Dublin Docklands was opened in September 2010. The Convention centre overlooks the River Liffey at Spencer Dock. It was designed by the American-Irish architect Kevin Roche. The CCD was shortlisted for the Engineers Ireland Excellence Awards – Engineering Project of the Year 2010.

In 1995, the then Irish government planned to build a National Convention Centre but this plan was abandoned. Minister for Tourism Enda Kenny had announced the location of the proposed convention centre to be at the RDS in Ballsbridge – this proved to be a dead-end.

In November 1997 with the new Fianna Fáil-led government elected, a new competition to build the conference centre was launched by Tourism Minister James McDaid, with seven consortiums entering. The Office of Public Works proposed to build the convention centre at Infirmary Road beside the Phoenix Park. The Ogden/Sonas Centre group headed by Robert White, whose plans for a casino-based scheme at the Phoenix Park had been abandoned by the previous government, also entered the competition. The Anna Livia Consortium, comprising Earlsfort Group, Bennett Construction and Kilsarin Concrete, proposed a conference centre complex within Dublin Port across the street from the O2.

Treasury Holdings, headed by Johnny Ronan and Richard Barrett, the ultimate winners of the competition, entered into an agreement with CIE to locate its project at Spencer Dock. Developer Harry Crosbie was also part of the consortium. Their plan included plans for two 250-bedroom hotels, at least one of which was never ultimately built. One hotel had been planned for the rear of the Convention Centre, but this was instead turned into a park. The closing date for entries was 31 January 1998.

The European Union agreed to provide a maximum grant of £25 million towards the project though this was conditional on the project was completed by the year 2000. The overall cost of the project at the time was projected at £35m to £45m, excluding site acquisition, according to the tender document. Successful bidders would also have to hand over £250,000 to Bord Fáilte for costs incurred by them.

Construction work began on the project in 1998, though ultimately not finishing until 2010. A legal dispute arose between its promoters, Spencer Dock International, the Dublin Docklands Development Authority and Dublin City Council which partly delayed the project.


...